How to check and accept the details of the new hou

2022-07-22
  • Detail

After the completion of housing decoration, acceptance is essential. The owner's acceptance of the project is based on the decoration contract, the construction drawings signed by the owner and the relevant documents of the relevant national departments on the quality inspection of the decoration project, mainly from the following aspects: Furniture: smooth lines, sealing lines, corner lines and panel interfaces are dense and smooth, door cabinet drawers are pushed and pulled smoothly, and handles are symmetrical and beautiful. Power line: the circuit laying should comply with the construction regulations and safety standards, plug

after the completion of housing decoration, acceptance is essential. The owner's acceptance of the project is based on the decoration contract, the construction drawings signed by the owner and the relevant documents of the relevant national departments on the quality inspection of the decoration project, mainly from the following aspects:

furniture: smooth lines, sealing lines, corner lines and panel interfaces are dense and smooth, the door cabinet drawers are pushed and pulled smoothly, and the handles are symmetrical and beautiful

power lines: the circuit laying should comply with the construction regulations and safety standards, the socket should be no less than 30 cm from the ground, the three wire socket ground wire, the kitchen and air conditioning lines should be laid in a special line, the main gate should be installed with an anti leakage switch, and the lamps should be installed firmly

doors and windows: open and close freely, and the door frame, window frame and glass perimeter are well sealed

ground: the floor tiles are flat, the texture is clear, the color is uniform, the cross hairs are horizontal and vertical, the floor is paved stably, the joints are even and straight, and the paint color is consistent without scratches

wall: the wallpaper is pasted firmly, the joints are tight, the patterns are complete, the patterns are consistent, the edge seams are neat and free of burrs, and the paint is uniform and flat, without concave convex feeling, color difference and ash falling

water supply and drainage facilities: the water supply pipe has no leakage, and the opening and closing valves operate well; The drainage is smooth without leakage and ponding

paint: the paint surface is smooth, feels good, has enough oil, and is free of nail holes, scanning marks, burrs and color differences

台州男科医院

秦皇岛男科医院

成都妇科医院

Copyright © 2011 JIN SHI